10 years ago Cannibal was under construction at Lagoon. This image was taken in early February 10 years ago and shared on the LagoonFans.com Forum by Utah Coaster Enthusiast.

Cannibal under construction with looping tracks is set against a backdrop of hills and a tall tower structure. The large rock structure that will eventually be a waterfall is wrapped in plastic.